Saudi Funded Electrical Network Updates - September 2018

التنزيل  (PDF, 718.38 KB)
نوع الوثيقة: Dashboards & Factsheets , Updates
نوع الوثيقة: English
تاريخ النشر: 4 November 2018 (5 years ago)
تاريخ الانشاء: 4 November 2018 (5 years ago)
عدد مرات التنزيل: 110

Saudi Funded Electrical Network Updates - September 2018

نوع الوثيقة: Dashboards & Factsheets , Updates
اللغة: English
Through the generous support of the Saudi Fund for Development (SFD), UNHCR will soon connect all shelters and much of the operational facilitates in Azraq camp to the electrical grid. Implemented over three concurrent phases this network covers the medium voltage lines (managed by EDCO), low voltage lines (managed by a local contractor, EDWAN) and the internal shelter wiring undertaken by trained refugees.

Partners

  • United Nations High Commissioner for Refugees

Sectors

  •  Access to Energy

موقع

  • Jordan

Population Group

الدولة Group
Syrian Arab Republic Syrian Arab Republic - Refugees
التنزيل  (PDF, 718.38 KB)